The project involved:
- civil earthworks 11,500BCM in rock
- subgrade supply and install using recycled crushed rock 500mm deep
- stormwater and subsoil drainage
- electrical and signalling conduiting
- construction of 2no crane pads each 245m in length
- Pavement construction and asphalt surfacing
- Bottom ballast installation
Works were undertaken during the winter months over a period of 20 weeks.